J4 ›› 2011, Vol. 46 ›› Issue (9): 122-126.

• Articles • Previous Articles    

Optimal inspection and replacement policy for a shock model with preventive repair

LI Ling1, CHENG Guo-qing1, TANG Ying-hui2   

  1. 1. School of Information Engineering, Jingdezhen Ceramic Institute, Jingdezhen 333403,Jiangxi, China;
    2. School of Mathematics & Software Science, Sichuan Normal University, Chengdu 610066, Sichuan, China
  • Received:2010-11-06 Online:2011-09-20 Published:2011-09-08

Abstract:

 Considering a shock model with inspection and preventive repair, and assuming that the repair of the system is not as good as new, the system average cost rate C(T,N) is obtained by using geometric process and renewal process, where T is the time interval of inspections and N is the number of system failure before replacement. Finally, the optimal policy is derived by using numerical method.

Key words: preventive repair; shock model; geometric process; average cost rate; replacement policy

No related articles found!
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!