JOURNAL OF SHANDONG UNIVERSITY(NATURAL SCIENCE) ›› 2015, Vol. 50 ›› Issue (03): 45-51.doi: 10.6040/j.issn.1671-9352.0.2014.018
Previous Articles Next Articles
GUAN Jing1, ZHANG Xiao-bin1, ZHANG Jin-feng2
CLC Number:
[1] Hanif D Sherali, ZHU Xiaomei. Two-stage fleet assignment model considering stochastic passenger demands[J]. Operations Research, 2008, 56(2):383-399. [2] LEVIN A. Scheduling and Feet-routing models for transportation systems[J]. Transportation Science, 1971(5):232-255. [3] ABARA J. Applying integer linear programming to the fleet assignment problem[J]. Interfaces, 1989, 19(4):20-28. [4] HANE C A, BARNHART C, JOHNSON E L, et al. The fleet assignment problem: solving a large-scale integer program[J]. Mathematical Programming, 1995, 70:211-232. [5] KNIKER T S, BARNHART C. Passenger mix problem: model, algorithms and applications[D]. Cambridge: Massachusetts Institute of Technology, MA, 1999. [6] BERGE M E, HOPPERSTAD C A. Demand driven dispatch: a method for dynamic aircraft capacity assignment, models and algorithms[J]. Operational Research, 1993, 41(8):153-170. [7] Hanif D Sherali, Ebru K Bish, ZHU Xiaomei. Airline fleet assignment concepts, models and algorithms[J]. European Journal of Operations Research, 2006, 172(1):1-30. [8] SMITH B C, JOHNSON E L. Robust airlinefleet assignment: Imposing station purity using station decomposition[J]. Transportation Science, 2006, 40(4):497-516. [9] LISTES O, DEKKER R. A scenario aggregation-based approach for determining a robust airline fleet composition for dynamic capacity allocation[J]. Transportation Science, 2005, 39(3):367-382. [10] 朱星辉.航空公司航班计划优化设计研究[D].南京:南京航空航天大学经济与管理学院,2007. ZHU Xinghui. Optimization design research on airline flight scheduling[D]. Najing: College of Economic and Management, Nanjing University of Aeronautics and Astronautics, 2007. [11] 李耀华,谭娜,郝贵和.飞机排班航班串编制模型及算法研究[J].系统仿真学报,2008, 20(3):612-615. LI Yaohua, TAN Na, HAO Guihe. Study on flight string model and algorithm in flight scheduling[J]. Journal of System Simulation, 2008, 20(3):612-615. [12] 肖东喜,朱金福.飞机排班中航班环的动态构建方法[J].系统工程,2007,16(11):19-20. XIAO Dongxi, ZHU Jinfu. Integrated research of airlines aircraft scheduling[J]. Systems Engineering, 2007, 16(11):19-20. [13] 魏星,朱金福.航空公司一体化飞机排班研究[J].武汉理工大学学报:信息与管理工程版,2013,35(1):86-90. WEI Xing, ZHU Jinfu. Integrated research of airlines aircraft scheduling[J]. Journal of WUT: Information& Management Engineering, 2013, 35(1):86-90. [14] Jay M Rosenberger. A robust fleet-assignment model with hub isolation and short cycles[J]. Transportation Science, 2004, 38(3):357-368. [15] 张英楠,牟德一,李辉.基于机会约束规划的航班应急调度问题研究[J].中国安全科学学报,2012,22(12):82-88. ZHANG Yingnan, MOU Deyi, LI Hui. Solving flight emergency scheduling problem based on chanceonstrained programming[J]. China Safety Science Journal, 2012, 22(12):82-88. [16] CHARNES A, COOPEr W. Chance-constrained Programming[J]. Management Science, 1959, 6(1):73-79. [17] 刘宝碇,赵瑞清,王纲.不确定规划及应用[M].北京:清华大学出版社,2003. LIU Baoding, ZHAO Ruiqing, WANG Gang. Uncertain programming and its application[M]. Beijing: Tsinghua University Press, 2003. [18] 马苏德巴·扎尔干.航空公司运营规划与管理[M]. 卲龙,王美佳,译.北京:中国民航出版社,2006. Masood Bazargan. Airline operations and scheduling[M]. Beijing: Chinese Civil Aviation Publishing House, 2006. |
No related articles found! |
|