山东大学学报(理学版) ›› 2016, Vol. 51 ›› Issue (12): 95-102.doi: 10.6040/j.issn.1671-9352.0.2015.527
董克1,2,吕文元1*,王永智2
DONG Ke1,2, LÜ Wen-yuan1*, WANG Yong-zhi2
摘要: 针对具有一定年龄的二手设备租赁的特殊性,提出周期预防维护策略。该维护策略从设备的全生命周期出发,综合考虑设备的残值、年龄、预防维护、小修以及惩罚机制等因素对利润的影响,建立以出租方期望利润最大化为目标的周期预防维护模型,并给出模型取得最优策略的理论证明。最后通过算例分析表明,该策略符合二手设备租赁维护的实际情况,可为出租方提供有效的维护解决方案。
中图分类号:
[1] TAN J S, KRAMER M A. A general framework for preventive maintenance optimization in chemical process operations[J]. Computers and Chemical Engineering, 1997, 21(12):1451-1469. [2] BARLOW R, HUNTER L. Optimum preventive maintenance policies[J]. Operations Research, 1960, 8(1):90-100. [3] WANG H. A survey of maintenance policies of deteriorating systems[J]. European Journal of Operational Research, 2002, 139(3):469-489. [4] PHAM H, WANG H. Imperfect maintenance[J]. European Journal of Operational Research, 1996, 94(3):425-438. [5] NAKAGAWA T. A summary of periodic replacement with minimal repair at failure[J]. Journal of the Operations Research Society of Japan, 1981, 24(3):213-228. [6] NAKAGAWA T, KOWADA M. Analysis of a system with minimal repair and its application to replacement policy[J]. European Journal of Operational Research, 1983, 12(2):176-182. [7] JATURONNATEE J, MURTHY D N P, BOONDISKULCHOK R. Optimal preventive maintenance of leased equipment with corrective minimal repairs[J]. European Journal of Operational Research, 2006, 174(1):201-215. [8] PONGPECH J, MURTHY D N P. Optimal periodic preventive maintenance policy for leased equipment[J]. Reliability Engineering and System Safety, 2006, 91(7):772-777. [9] YEH R H, KAO K C, CHANG W L. Optimal preventive maintenance policy for leased equipment using failure rate reduction[J]. Computers and Industrial Engineering, 2009, 57(1):304-309. [10] YEH R H, CHEN C K. Periodical preventive-maintenance contract for a leased facility with Weibull life-time[J]. Quality and Quantity, 2006, 40(2):303-313. [11] YEH R H, CHANG W L. Optimal threshold value of failure-rate for leased products with preventive maintenance actions[J]. Mathematical and Computer Modelling, 2007, 46(5):730-737. [12] YEH R H, CHANG W L, LO H C. Optimal length of lease period and maintenance policy for leased equipment with a control-limit on age[J]. Mathematical and Computer Modelling, 2011, 54(9):2014-2019. [13] CHENG C Y, ZHAO X F, CHEN M, et al. A failure-rate-reduction periodic preventive maintenance model with delayed initial time in a finite time period[J]. Quality Techonlogy and Quantitative Management, 2014,11(3):245-254. [14] 金琳, 黄开敏, 周晓军. 租赁设备的多阶段预防性维护策略及优化[J]. 计算机集成制造系统,2013,19(12):2947-2953. JIN Lin, HUANG Kaimin, ZHOU Xiaojun. Multi-period preventive maintenance policy and optimization for leased equipment[J]. Computer Integrated Manufacturing Systems, 2013, 19(12):2947-2953. [15] CHANG W L, LO H C. Joint determination of lease period and preventive maintenance policy for leased equipment with residual value[J]. Computers and Industrial Engineering, 2011, 61(3):489-496. [16] SHAFIEE M, CHUKOVA S. Maintenance models in warranty: a literature review[J]. European Journal of Operational Research, 2013, 229(3):561-572. [17] CHATTOPADHYAY G N, MURTHY D N P. Warranty cost analysis for second-hand products[J]. Mathematical and Computer Modeling, 2000, 31(10):81-88. [18] PONGPECH J, MURTHY D N P, BOONDISKULCHOCK R. Maintenance strategies for used equipment under lease[J]. Journal of Quality in Maintenance Engineering, 2006, 12(1):52-67. [19] YEH R H, LO H C, YU R Y. A study of maintenance policies for second-hand products[J]. Computers and Industrial Engineering, 2011, 60(3):438-444. [20] CORIA V H, MAXIMOV S, RIVAS-DÁVALOS F, et al. Analytical method for optimization of maintenance policy based on available system failure data[J]. Reliability Engineering and System Safety, 2015, 135:55-63. [21] MELCHOR-HERNÁNDEZ C L, RIVAS-DÁVALOS F, MAXIMOV S, et al. A model for optimizing maintenance policy for power equipment[J]. International Journal of Electrical Power and Energy Systems, 2015, 68:304-312. |
No related articles found! |
|